Transition from Concept to Detail Phase

An evaluation and quality assurance of the building design is a natural part of starting the Construction Phase of a project. Here are some tips!

Upgrading the MMI status from 200 to 300:

Evaluate every building system separately

Use the MMI as an instrument for holding decision-makers accountable:


Make sure that every stakeholder assumes its role:

Reponsibilities

TFK (Tverrfaglig kontrol) is planned for with good margins:

The period and frequency for interdisciplinary model checks must be agreed upon in the project plan for all relevant disciplines.

Regardless of the content of the control, there must be a follow up plan in place